1. Pitch access from car park to temporary corridor
2. Temporary corridor. Services in and ceiling grid installed. Ceiling tiles to be fitted. Dado trunking (needs second fix of power data) shows this will be a back of house office of some sort. Door to the right will be used when complete and double width opening will be infilled once all else complete - plasterboard drylining, with tape and joint finish.
3. Dog-leg left and then right into red floored room. Double width doorway possibly temporary.
4. Through and then left into grey floored corridor. Floor finished, walls finished, dado trunking in, ceiling tiles to go in.
5. This sign is not visible in the previous picture. Note wall lighting probably temporary (cable visible to the right of the fitting). Disconnect and make good hole when ceiling lights are on.
6. View down the corridor. This is a permanent corridor - no dado trunking - ceiling tiles to go in and possibly final ironmongery but otherwise complete. The route now turns right between where the wall finishes and before the first door visible on the right.