So has the structural design contract ever been open for tender? Considering the costings appear substantially complete, a fair amount of design must have been achieved already. I did attend a presentation from Arup Sport who, by chance, were presenting a design, I presume their design was not chosen.
Any indications which contractors are in the running? Need to start applying for graduate jobs, rather keep in with the ones likely to be working on Anfield.