Pretty self explanatory I thought, but hey ho.
Echo Arena was cited on here as being the events venue for Liverpool City and how Anfield would in no way be allowed to stage events, taking away from the Echo.
To be fair if they had a stadium masterplan it's never been mentioned in 10 years. Kind of my point.
.
Why is a simple design alteration taking so long, if both ends of KD stand and Main (inc the roof) don't cause a problem? Surely a simple case of putting this (ARE design) out to tender to do upto RIBA design stage, put the planning in again to council, and then you can wait till majority of new training ground is done, whilst you tender the construction work for ARE.
I'd be really surprised if it is a funding issue, or manpower issue. We should be able to handle two projects at the same time.